Latest news from Spaciotempo

Spaciotempo meets space needs of Stadco

01 June 2011

Tier 1 supplier of automotive Body-in-White products and services, Stadco, is gearing up to meet demand from automotive customers with a new storage facility at its state-of-the-art site in Castle Bromwich, one of the largest car press lines in Europe.

The company, which manufactures parts for some of the most recognisable global car brands, has worked with Spaciotempo – a leader in the provision of temporary warehouse and storage buildings – to provide a huge 2200 sq m storage area which comprises two gutterlinked aluminium framed buildings and a front canopy to form a structure some 65 m in length, 35 m wide and 6 m high.

To provide an ambient temperature for the storage of the precision made steel and aluminium parts the warehouse features a thermo roof and 40mm steel clad panels for the walls and gables. With wind and snow loadings equivalent to permanent buildings, the structure is securely fastened to existing surfaces using a patented fixing system that requires no civil work undertaking prior to installation.

Sales and Marketing Director of Stadco, Dinos Andreou, is delighted with the result;

“Stadco, with its 5 UK based divisions, is benefiting from the upturn in the fortunes of the vehicle manufacturing sector. Extra business resulted in the need for some additional warehouse space at our Castle Bromwich plant and Spaciotempo was able to react to our requirements very quickly. The beauty of a temporary warehouse is that we can use the space flexibly – renting a building when the market is strong and if the market contracts again then the building can be off-hired. It enables us to manage our needs very effectively.”

The building is on hire from Spaciotempo for an initial period of xx months and has been specified complete with 4 electrically operated roller shutter doors and 4 personnel exit doors, keeping pedestrians and fork lifts separated in line with health and safety requirements.  A rolling contract enables Stadco to keep the building in place for as long as they need it.

Other Press Releases By This Company

Released By

Spaciotempo

Related Websites

Related Industry Sectors