Refrigerated Trailer Hire

Refrigerated Trailer Hire

Our Refrigerated Trailer units are ideal for convenience supermarkets, planned maintenance works, refurbishments, hotels, restaurants, schools, colleges, exhibitions, also all catering events such as weddings, shows, festivals, and parties.

Based in Birmingham, we cover the whole of the UK delivering refrigerated fridges and freezers.

We offer temporary refrigeration and backup emergency refrigeration hire service for any individual or business that requires immediate, short term or long-term hire.

Our units are easy and straightforward to use. Plug into a standard 13amp or 16amp socket or generator.
View Product on Company Website

Other Products and Services from Carter Synergy

Case Studies: Tesco Metro Caxton Gate, New Street, Birmingham

Case Studies: Tesco Metro Caxton Gate, New Street, Birmingham

In collaboration with the construction partner Uplands Construction Ltd and the crane lift team from DJ Transport, Carter Synergy successfully navigated substantial challenges during a recent refurbishment of a Tesco Metro site in Central Birmingham.

This store occupies the basement, ground, and first floors of a seven-storey building, with the roof identified as the only viable location for the installation of new refrigeration units essential for the project. The site’s central location in the city posed additional challenges, including exceptionally narrow roadways and heavily restricted access.

Mechanical & Electrical

Mechanical & Electrical

Delivering efficient, safe and sustainable Mechanical and Electrical products, support and maintenance to any environment.
We offer an extensive range of services to suit almost every environment and application. Our multidiscipline engineers excel in the provision of maintenance to Mechanical, Electrical, Heating & Ventilation systems.
We boast an industry-leading team who can offer our clients a complete package for any requirement. We strive to ensure the quality, safety and sustainability of your building and its critical support systems.
Case Studies: Integrated CO2 Convenience Refrigeration Installation

Case Studies: Integrated CO2 Convenience Refrigeration Installation

The objective of this project was to introduce CO₂ refrigeration to the BP estate, ensuring optimal value and benefit regarding environmental impact.

As a key supplier, Carter Synergy designed and implemented a fully integrated refrigeration solution, focusing on the following essential components:

  • Provision of all refrigeration capacity
  • Introduction of a secondary temperature zone for air conditioning
  • Delivery of all building heating through heat recovery systems

The design was presented and received approval in late 2013, with the St Ives store selected for a trial. The installation was completed and became operational by July 2014.

Post-installation, a period of monitoring commenced, allowing for a direct comparison with a similarly formatted store in Cockfosters, and this has been ongoing to date. 

This document provides an overview of the initiative and outlines the findings from the monitoring process thus far.

Carter Synergy Logo 001

Carter Synergy

90 Lea Ford Road, Birmingham, West Midlands, B33 9TX, United Kingdom

Carter Synergy is a UK leader in refrigeration, HVAC, and M&E services, delivering design, installation, maintenance, and support nationwide. We serve key sectors with safe, reliable, end-to-end engineering solutions backed by 80+ years of expertise.