Case Studies: Revitalising Ryecroft Hall: A Vision for Sustainable Retail

Case Studies: Revitalising Ryecroft Hall: A Vision for Sustainable Retail

In late 2021, Carter Synergy was approached to commence operations at Ryecroft Hall Public House in Hambleton. Our team was entrusted with the decommissioning of the site’s existing refrigeration beer cellar systems, air conditioning, natural gas, and electrical services, effectively preparing the location for demolition—this marked the beginning of an ambitious four-year venture.

The objective? To develop a state-of-the-art Central England Co-operative store, complete with residential flats above, spanning 0.55 acres.

However, this was not just another retail development. The vision was to establish an ‘Eco Store’—a flagship project that seamlessly integrates the latest sustainable technologies throughout both the construction and fit-out phases. Carter Synergy played a pivotal role from inception to completion, designing and installing the mechanical, electrical, refrigeration, and public health services that would underpin the store’s exceptional green credentials.

View Product on Company Website

Other Products and Services from Carter Synergy

Case Studies: Cheese Production Facility Plant Replacement

Case Studies: Cheese Production Facility Plant Replacement

A prominent client located in Leek, Staffordshire, requires substantial cooling solutions for their cheese production facility. Historically, this cooling has been achieved through chiller packages operating in conjunction with chilled glycol loops. 

As the chillers approach the end of their operational lifespan, it has been decided that Carter Synergy will spearhead the design, specification, and installation for a phased replacement of the existing machinery, ensuring that production remains uninterrupted.

Refrigerated Cabinets

Refrigerated Cabinets

Carters provide our clients with a total solution for refrigerated display equipment. With a variety of products available we can offer everything from the design, development, testing, project management and after-sales service.
We have a well-established and enviable reputation for quality, efficiency and customer care both here in the UK & across the world. We are widely regarded as a world-leading brand in this field. First established in 1945 our business has proudly served some of the world’s biggest retailers for over half a century.
Carters design incorporates an appraisal of the latest technology, particularly in terms of life cycle costing, through the use of energy-efficient methods, whilst paying the utmost regard to environmental concerns. Our design engineers are experienced in technologies that provide efficiently controlled systems and can provide best in class solutions to exceed our client’s expectations.
Service & Maintain

Service & Maintain

With one of the largest & most experienced service teams in the industry, Carter Synergy is a leader in delivering reactive service & preventative maintenance contracts in the United Kingdom.
Our service call centres & engineers process & react to over 160 000 service calls a year, in every corner of the country. With dedicated offices in London, Birmingham, Liverpool, Glasgow and Inverness we truly are national.
Our maintenance teams carry out over 20 000 planned maintenance visits annually to ensure our clients’ systems are kept operational and efficient. Our 24/7/365 call centre is located at our Glasgow site with a separate team of maintenance & Service specialists maintained at our Birmingham office.
Our team of engineers are trained to the highest standards both within their specialist area’s but critically within Health & Safety.
Carter Synergy Logo 001

Carter Synergy

90 Lea Ford Road, Birmingham, West Midlands, B33 9TX, United Kingdom

Carter Synergy is a UK leader in refrigeration, HVAC, and M&E services, delivering design, installation, maintenance, and support nationwide. We serve key sectors with safe, reliable, end-to-end engineering solutions backed by 80+ years of expertise.