Case Studies: Integrated Transcritical CO2 Solution
Carter Synergy was approached by our esteemed client, The Co-operative Group (TCG), to adapt our integrated CO₂ solution for a trial across their estate. Collaborating closely with Green & Cool Refrigeration (G&C), we customised our already successful system specifically for the Hulme store.
The key objectives for TCG included:
- A system based on natural refrigerants
- Reduction in energy consumption
- No adverse effect on customer experience
- Financially sustainable technology
Our system has successfully met, and will continue to meet, all of the above criteria.
Other Products and Services from Carter Synergy
Refrigeration
Our expertise in refrigeration systems has been developed over the many years our business has been in existence.
Our experience has seen us work with many of the country’s leading businesses, supporting the design, development and installation of solutions. Our engineering teams have worked in a hugely diverse range of environments delivering solutions that support our client’s critical infrastructure.
Case Studies: Critical Control Pharmaceutical Chiller
Our client, Avarto Bertelsmann, sought our expertise for a vital temperature-controlled facility designed for a variety of high-value pharmaceutical stock.
Having collaborated with the client previously on a comparable project in Kings Norton, Birmingham, Carter Synergy & Carter Coldstores were perfectly positioned to execute this prestigious undertaking. The facility is located at the East Midlands Gateway site, near Derby, within the Segro development Logistics Park, conveniently situated just off the M1.
Case Studies: Cheese Production Facility Plant Replacement
A prominent client located in Leek, Staffordshire, requires substantial cooling solutions for their cheese production facility. Historically, this cooling has been achieved through chiller packages operating in conjunction with chilled glycol loops.
As the chillers approach the end of their operational lifespan, it has been decided that Carter Synergy will spearhead the design, specification, and installation for a phased replacement of the existing machinery, ensuring that production remains uninterrupted.
Carter Synergy
90 Lea Ford Road, Birmingham, West Midlands, B33 9TX, United Kingdom
Carter Synergy is a UK leader in refrigeration, HVAC, and M&E services, delivering design, installation, maintenance, and support nationwide. We serve key sectors with safe, reliable, end-to-end engineering solutions backed by 80+ years of expertise.