Bournemouth Project

16 September 2025 | Thermal Clad Ltd

Bournemouth Project

A customer required our expertise as specialist insulation and cladding contractors to insulate a ductwork riser which was located 30m high rising on the outside of a building in the Bournemouth area.

The work involved insulating and cladding the ductwork whilst in-situ. This required a quick turn-around as the customer had supplied the scaffold at their expense. The 30m high insulated ductwork was finished with metal cladding which was manufactured by our cladding expert team at our premises in Tamworth and delivered to the site for installation by our installers.

The cladding was particularly manufactured and installed as to avoid covering the ductwork access doors, thus providing an excellent example of our metal cladding expertise, workmanship skills and willingness to undertake countrywide projects.