17 November 2026 | The Plastics Shed Ltd
Soffit Ventilation: Why Your Roof Needs It and Three Ways to Fit It
Soffit ventilation explained in plain English: what it does, why both sides of the roof need it, and how I'd choose between vented soffit board, strip vents and disc vents.
Soffit ventilation is one of those things nobody thinks about until the loft starts sweating. It lets fresh air in under the eaves, and it works with the vents up at the ridge or in the tiles: air comes in low, crosses the loft and goes out high, taking the warm, damp air with it. Without it, you get condensation, mould and, given long enough, rotten timbers.
The amount a roof needs is given as a "continuous equivalent", which is the width of an unbroken gap running the full length of the eaves. You'll rarely fit an actual gap. You fit enough vents to add up to the same free air area. The figure depends on the roof, and a steep pitch, a wide span or a lean-to needs extra at the ridge as well.
Two things I see missed all the time. The eaves figure applies to both sides of a pitched roof, because the point is air crossing the loft, not just getting into it. And BS 5250 itself admits that ventilation as designed and ventilation as installed are rarely the same thing. If you're anywhere near the minimum, go up a size.
There are three ways to get the air in.
Vented soffit board has the ventilation built into the board, so it runs the full length by design. Nothing to space out, nothing to count. Check the rating matches what your roof needs and the job's done. If you're replacing the soffit anyway, this is the one I'd use.
A strip vent runs along the soffit and is rated per metre, so again there's no counting. It's the answer when the existing soffit is staying, or when someone's put solid board up and the ventilation needs bringing back.
Disc vents are the round ones you drill and push in. They're the only type you have to work out, and the only type you can get wrong. On a normal pitched roof, allow one every 200mm, which is five per metre. An 8m frontage takes 40.
Regulations do get revised, so if your job is notifiable, check the current documents before you buy, not a website. Mine included.