Case Studies: L Shape Wholesale Freezer

Case Studies: L Shape Wholesale Freezer

Carter Synergy has a number of key clients, one of which is a large food wholesaler and distributor based in Birmingham. A number of high profile and extensive projects have been undertaken in collaboration with the client in the last five years. Most recently one of the client’s critical freezer coldstores was determined to have reached the end of life and a solution had to be developed to replace this room, plant and all the associated electrical, construction and mechanical works to support this. 

The initial assessment of the project immediately highlighted that the existing plant was inefficient and posed a high level of financial risk due to the refrigerant in use. Originally designed as an R22 system the four large reciprocating compressor/receiver sets had previously undergone two retrofits, first to R422d and then more recently to R438a (MO99). The client in conjunction with our design department settled on a natural refrigerant solution based on CO2 and a further consideration required the system to include a heat exchanger which would redirect rejected heat from the system into the ambient warehouse area and act as comfort heating for the staff. 

View Product on Company Website

Other Products and Services from Carter Synergy

Case Studies: Integrated Transcritical CO2 Solution

Case Studies: Integrated Transcritical CO2 Solution

Carter Synergy was approached by our esteemed client, The Co-operative Group (TCG), to adapt our integrated CO₂ solution for a trial across their estate. Collaborating closely with Green & Cool Refrigeration (G&C), we customised our already successful system specifically for the Hulme store. 

The key objectives for TCG included:

  • A system based on natural refrigerants
  • Reduction in energy consumption
  • No adverse effect on customer experience
  • Financially sustainable technology

Our system has successfully met, and will continue to meet, all of the above criteria.

Refrigerant Detection

Refrigerant Detection

With an extensive range of high-quality leak detection solutions available there is a system to suit almost any application. From retail store operations through to data centres, civilian & military maritime craft, banks, hospitals, food production & so many more.
Based in West London, CPC(UK) has evolved to become one of the market leaders in refrigerant leak detection, refrigeration controls and energy reduction initiatives. Offering a range of products we provide our clients with an extensive range of carbon-reduction solutions for their refrigeration or Air Conditioning installation.
The business prides itself on our focus towards innovation, environmental concerns & strategic client partnerships.
Case Studies: The Prestigious Birmingham Wholesale Market

Case Studies: The Prestigious Birmingham Wholesale Market

The Birmingham Wholesale Market is the largest fully integrated market in the UK, featuring Horticultural products, Fish, Meat and Poultry, as well as Flowers. The original Birmingham Wholesale Market, located in the heart of Digbeth, officially closed on 5th May 2018 and reopened at its new site in Aston, Birmingham, on 8th May 2018.

Carter Synergy, a Birmingham-based company, is proud to have been awarded several Full Design & Build projects for numerous market traders. Our projects included the construction of mezzanine structures, offices, and toilets, alongside essential mechanical and electrical (M&E) works, ventilation systems, sprinkler systems, and fire alarm installations—all completed in accordance with building regulations and to the satisfaction of both the traders and Birmingham City Council. Additionally, we undertook comprehensive refrigeration installations, which included the construction of Coldroom structures and the associated plant.

We provided a wide and diverse range of services across all six units for George Perry Ltd, the oldest wholesale traders of fruit and vegetables in the UK.

Carter Synergy Logo 001

Carter Synergy

90 Lea Ford Road, Birmingham, West Midlands, B33 9TX, United Kingdom

Carter Synergy is a UK leader in refrigeration, HVAC, and M&E services, delivering design, installation, maintenance, and support nationwide. We serve key sectors with safe, reliable, end-to-end engineering solutions backed by 80+ years of expertise.